The AS40 closed welding head is an orbital automated welding head designed for the butt welding of tubes ranging from 6.35 mm to 38.1 mm in diameter. It is widely utilized in industries such as pharmaceuticals, water treatment, and food processing. This lightweight welding head is suitable for use in confined spaces and allows for welding within the interior of equipment.
1. portable orbital welding machine primarily designed for welding stainless steel pipe fittings with a wall thickness of less than 2.5 mm; features a pneumatic self-centering fixture that enables rapid clamping.
2. Equipped with a circulating water cooling system to support prolonged, continuous welding operations; the total cable length is 10 meters, making it suitable for work in elevated or confined spaces.
3.arc orbital welding machine features an improved drive system within the welding head, utilizing enhanced materials for greater durability and more stable weld quality.
4. TIG orbital welding machine suitable for welding materials such as stainless steel, carbon steel, and titanium alloys; the welding head has a net weight of 3.5 kg.
1. Biopharmaceuticals: on-site installation of purified water, water for injection, and fermentation ingredient clean pipelines, as well as workshop prefabrication
2. Food and Beverage: piping for beer, dairy, and juice processes, as well as filtration equipment piping
3. Semiconductor/Electronics: construction of high-purity specialty gases, ultrapure water, and vacuum clean pipelines
4. Laboratory/Research: installation of laboratory gas supply and ultrapure water unit pipelines
5. Water Treatment: prefabrication of stainless steel pipelines for reverse osmosis and EDI pure water equipment
1. Pre-check: Turn on water, electricity, and argon; clean the pipe ends with alcohol and align and secure the pipes.
2. Clamping: Mount the fixture on the pipe, clamp the AS40 sealing head, and install the inner argon stopper.
3. Gun adjustment: Fine-tune the tungsten tip distance to the groove at 0.5~0.8mm, align the seam in the center.
4. Pre-argon filling: Vent internally and externally, purge for 30~50 seconds in advance.
5. Parameter setting: Select pipe diameter and wall thickness on the panel, call up the stainless steel program, and run one air-turn test.
6. Welding: Start with one button, the welding head rotates 360° automatically to weld.
7. Finishing: Keep argon for cooling after welding, remove the welding head, unload the pipe, and shut off the gas and power.
Where is your factory located?
5th Floor, Building 3, Huaqing Innovation Park, No. 1 Qingyan Road, Huishan District, Wuxi City, Jiangsu Province.
What certifications does your company hold?
We hold the ISO 9001 Quality Certification and the CE Certification.
What are your company's main products?
Our company mainly produces automated welding machines for orbital closed pipes, tube sheet welding machines, automated welding machines for pipe flanges, open-type automated welding machines, pipe cutting machines, pipe facing machines, etc.
Are you a manufacturer?
Yes, our company is a manufacturer that integrates production, manufacturing, and sales of automated welding machines.
What is the delivery period?
Three to seven days.
How can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment.
What services can we provide?
Accepted Delivery Terms: FOB;
Accepted Payment Currency: USD,CNY;
Accepted Payment Type: PayPal;
Language Spoken: English,Chinese.